ENGINEERING WORKSHOP - MIDDLESBROUGH COLLEGE
This project consisted of a single-storey mono-pitch portal frame structure with a partial first-floor.
Shipley Structures were responsible for the manufacture and installation of approximately 200 tonnes of hot and cold rolled sections, along with the supply and installation of metal decking and pre-cast concrete stairs.
Perimeter columns and bracings on two elevations were permanently exposed and galvanised.